Preparation start of basic equipment ( Steam-gas installation- 110 mVt) in HPS in Vologoda.

Friday, November 08, 2013HPS in Vologoda. Vologda.

Specialists CJSC SMU SZEM and TGK-2 have works on preparation start of basic equipment Steam-gas installation-110MW in HPS in Vologoda.
Heat recovery boiler produced by Czech company Bilfinger Babcock CZ s.r.o, is on the stage of high-speed water washings. Gas turbine with the power 75Mvt produced by General Electric company is ready for start.

Heat recovery boiler
Date of redaction:12.09.2014 9:11:08

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT