Reconstruction of the heat mechanical equipment
JSC Pulp and Paper Mill

Parameters of the project

StateFinished
AddressTown Kondopoga
Customer
Volume of the worksVolume 500 tons
Beginning2000
End2008
Category of the projectInstallation; Reconstruction and repair

Description of the works

Conversion of 5 boilers BKZ-100 to gas fuel;

Overhaul of the TPS pipelines and equipment;

Overhaul of boilers BKZ-100 in blocks №1, 2, 3, 4, 5;

Installation of pipelines of a central point for gas flow measurement;

Installation of turbines (2х30 MW) in Leningradsky Metal Plant;

Reconstruction of TPS-1-3 boiler Е-160-3, 9-440-GM (TGME-190);

Installation of reservoirs with different purposes and volumes.

Date of redaction:12.09.2014 13:23:15

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT