Construction of two blocks 450 MW each
North-West TPS

Parameters of the project

StateFinished
AddressSaint-Petersburg
CustomerNorth-West TPS
Volume of the works28,000
Beginning1997
End2006
Category of the projectInstallation; Manufacturing; Power-hoisting equipment operating

Description of the works

Construction of two blocks of 450 MW (the first gas steam station in Russia);

Installation of heat recovery boilers P90 – 4 pieces;

Installation of Siemens gas turbines - 4 pieces;

Installation of a turbine unit T-150-7,7 - 2 pieces;

installation of a complex air purifying device (KVOU) GT – 4 sets;

Installation of steam and gas turbine generators with capacity 150 MW - 6 pieces;

Installation of all-station pipelines and equipment;

Installation of reservoirs with different purposes and volumes;

Installation of reservoirs with different purposes and volumes;

Production of shaped details and fire alarm system OPS.

General view of the station
Date of redaction:12.09.2014 10:33:01

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT