Construction of the PGU-110
HPS

Parameters of the project

StateFinished
AddressVologda
CustomerJSC OGK-2
Volume of the works1300 tons
Beginning2011
End2014
Category of the projectInstallation

Description of the works

JSC Territorial Generating Company №2 (TGC-2) in Vologda realizes the investment project on the construction of a steam gas unit with capacity 110 MW which consists of Gas Turbine PG 61111FA with capacity 75 MW produced by General Electric, steam turbine with capacity 35 MW produced by Turbine Plant in Kaluga and heat recovery boiler produced by Czech plant Bilfinger Babcock CZ s.r.o.

JSC CIA SZEM works on the installation of heat mechanical equipment including a heat recovery boiler, low and high pressure pipelines, ancillary equipment and different metal service platforms, slabs and frames of a boiler.

The input of SGB-110 MW in Vologda TPS is scheduled for the 4-th quarter in 2013. In the result of the project’s implementation capacity of the TPS in Vologda will be increased in 3 times.

Date of redaction:12.09.2014 13:24:52

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT