Reconstruction of TPS-1 in Izhevsk. Installation of SGB-230.
TPS-1

Parameters of the project

StateCarries out
AddressTown Izhevsk
CustomerJSC TGK-5
Volume of the works870 tons
Beginning2013
End---
Category of the projectInstallation

Description of the works

The project of the reconstruction of TPS-1 in Izhevsk provides for the construction of the monoblock SGB-230 based on a gas turbine unit GTP-160, a steam heating turbine, a two-circuit heat recovery boiler. It allows to increase installed power capacity of TPS in 4 times, from 69 MW to 290 MW and heat capacity about 715 Gcal/hr.

JSC CIA SZEM installs a gas turbine GTP-160 with capacity 160 MW produced by JSC Silovyi Mashinyi and complex air purifying devices (KVOU).

Complex testing of the updated station is scheduled for 31st December 2013.

Date of redaction:12.09.2014 13:24:07

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT