Building block of 330 MW
HPS

Parameters of the project

StateCarries out
AddressNovocherkassk
CustomerJSC OGK-2
Volume of the works22,000 tons.
Beginning2011
End2014
Category of the projectInstallation; Manufacturing; Power-hoisting equipment operating

Description of the works

Installation of heat mechanical block-9 output 330 MW of the Novocherkasskaya HPS which contains such equipment as:

Steam generator CKS (with a circulating boiling layer) which has nominal steam capacity 1,000 t/hr, the pressure at the outlet of the boiler is 24,5 mps, fresh steam temperature is 565 degrees C, manufactured by EMAlliance (involving Corporation Foster Wheeler);

Steam turbine generator K-330-23,5 with nominal capacity 330 MW and steam parameters before the turbine to=566 оС, РО=23,5 mps manufactured by JSC TURBOATOM in Kharkov, Ukraine;

Turbine generator TGV-330-2MUZ with hydrogen cooling manufactured by JSC ELECTROTYAZHMASH in Kharkov, Ukraine.

General view of the station
Date of redaction:12.09.2014 13:22:00

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT