Construction of a block with capacity of 200 MW
TPS-5

Parameters of the project

StateFinished
AddressSaint-Petersburg
CustomerJSC Lenenergo
Volume of the works1615 tons
Beginning2005
End2005
Category of the projectInstallation; Manufacturing

Description of the works

Installation of network pipelines on the racks;

Installation of a gas pipeline and gas distribution point GRP;

Installation of technological pipelines;

Production and installation of reservoirs with different purposes and volumes;

Installation of pipelines and equipment of the pumping station of acid and filter pressure wash, reagent equipment and chemical water treatment produced by YIT RAKENNUS, Finland.

Date of redaction:12.09.2014 10:33:01

Adjacent projects

Contacts

Russia,191036,Saint Petersburg,21/2, 6th Sovetskaya St, 5th floor

Tel: +7 (812) 3246764

Fax: +7 (812) 3246762

E-Mail: office@smuszem.ruMORE DETAILS...
© 2014 CJSC SMU SZEM. All rights reserved.
© 2014 Site's development. CJSC SMU SZEM Center of Computer and IT